Blank field record - complete with approved project requirements Item,Required / approved value,Observed value / record,Accept / Hold / N.A.,Reviewer / time Project / panel location,,,, GCL construction / roll IDs,,,, Drawing and method revision,,,, Subgrade release,,,, Measured side overlap S,,,, Measured end overlap E,,,, Bentonite material / rate / seam length,,,, Penetrations / anchors / intersections,,,, Exposure and rainfall record,,,, Wet-area disposition / repair release,,,, Inspector and release time,,,, Cover material / thickness / placement time,,,,